Apple Server Diagnostics - Ethernet Controller Tests

background image

Ethernet Controller Tests

The availability of Ethernet controller tests depends on the Enternet controller installed
in the server.

Data loop tests can add to network traffic. Consider disconnecting from the network
before running the data loop tests.

Test

Estimated completion time

Description

MAC Address Verification

1 second

Verifies MAC address isn’t all FFs
or 00s.

MAC Loopback

1 minute

Verifies that there’s no data
mismatch between sent and
received data while looping
within the MAC (a sublayer of
the datalink layer in the ISO
network reference model).

PHY 1000 Loopback

20 seconds per port, 40 seconds
total

Verifies that there’s no data
mismatch between sent and
received data while looping
within the physical transport
medium (PHY) at 1000 Mbps.

PHY Jumbo Packet Loopback

25 seconds per port, 50 seconds
total

Verifies that there’s no data
mismatch between sent and
received jumbo packet data
while looping within the
physical transport medium
(PHY) at the the highest
supported speed.

background image

52

Appendix

Server Diagnostics Test Reference